Project Story · Bathroom

Full Bathroom Remodel
in San Francisco

A dated tiled bathroom taken down to the studs and rebuilt as a bright, spa-style room. Here's how the job was run — what we found once the walls were open, how every change was handled, and how it turned out.

BathroomSan Francisco, CAFull gut renovationCompleted 2026
ProjectFull bathroom remodel
LocationSan Francisco, CA
ScopeGut to studs & subfloor
ChangesEach one approved in writing
After: San Francisco bathroom with floor-to-ceiling marble-look slabs, marble wall-mount sink and brushed gold fixtures
Before: original tiled bathroom in San Francisco before the remodel
BeforeAfter

Drag the handle to compare. Same room, rebuilt from the studs out.

How we ran it

Start to finish, step by step

  1. 1
    Before any work

    Walkthrough & written proposal

    We met the owners in the space, measured, and talked through the look they wanted. Everything — demolition, waterproofing, slab walls, fixtures, lighting — went into one written proposal with a payment schedule tied to completed stages of work.

  2. 2
    Demolition

    Down to the studs — and what we found

    We removed the old tile, fixtures and finishes down to the framing and subfloor. Once the floor was open, it was clear the subfloor needed repair before anything new could go on top of it.

    Change order — subfloor repair. We photographed it, explained it, priced it, and the owner signed off before we continued.
  3. 3
    Rough-in

    Plumbing & electrical brought up to date

    With the walls open, we upgraded the plumbing and electrical to support the new rain shower, lighting and fixtures — the right time to do it, before anything gets closed up.

    Change orders — electrical and plumbing. Both written and approved before the walls were closed.
  4. 4
    Finishes

    Slabs, fixtures & the details

    Floor-to-ceiling marble-look slabs went up, followed by the marble wall-mount sink, rain shower with handheld, and brushed gold fixtures throughout.

  5. 5
    While we were there

    A small extra request

    The owners asked us to swap light fixtures in the bedroom and entry. We wrote it up as its own small change order so the bathroom scope stayed clean and easy to follow.

  6. 6
    Close-out

    Final walkthrough & punch list

    We walked the finished room with the owners detail by detail and closed out every item on a written punch list.

No surprises: every change, in writing

Opening up an older San Francisco bathroom almost always turns something up. What matters is how it's handled.

  • Problem shown to the owner — photos, not just a phone call
  • Written change order with a clear price before any extra work
  • Each change order shows the updated contract total, so the running number is never a mystery
  • One point of contact from proposal to final walkthrough
What went in

Finishes & features

  • Floor-to-ceiling marble-look slabs
  • Marble wall-mount sink
  • Rain shower + handheld
  • Brushed gold fixtures
  • Updated plumbing & electrical
  • Repaired subfloor